Email
info@chcltd.com
 

London partnership with Pegler Yorkshire

14/03/2016

CHC Group Ltd have completed yet another prestigious project in association with Pegler Yorkshire, which has featured in the latest edition of the Plumbing and Heating Magazine.

Commissioning

Pegler Yorkshire have featured in the latest edition of the Plumbing and Heating Magazine, speaking of their excellent partnership with CHC Group and the latest, prestigious venture at Westminster Bridge in London.

CHC were named as main Mechanical Contractors for the new Apart-hotel complex at Westminster Bridge in London.

The design of this project was crucial for the new Marlin Apartments, supporting sustainability and building performance whilst also sustaining a modular design system. Having the assistance of Pegler Yorkshire from the initial design stages of the project has enabled valuable engineering solutions, training for the installation teams as well as providing Warranty Plus guarantee.     

Timing was another key factor in this project, and with using the heat free installation method, CHC were at ease, being able to install a quicker, cleaner system.

Pegler Yorkshire provided the ideal solution for CHC Group through their the Xpress Carbon and Copper systems as well as Tectite for anything lower than 54mm

This allowed CHC to complete a prestigious job, to high standard, using top quality products whilst reducing the install time and offering sustainability and building performance.

 You can read the full article here.