King's Theatre, Edinburgh

Refurbishment Works at King's Theatre, Edinburgh

CHC Kings Theatre Edinburgh


Client:                          RYBKA/ King's Theatre
Main Contractor:      H&J Martin
Completion:               June 2012 
Details:
CHC Group worked alongside main contractor H&J Martin to install a new plant room/ ventilation system and associated pipework as part of the refurbishment of the Grade A listed building.
The architect had environmental concerns over the noise and look of the air handling units in the listed building.  Positive solutions to the concerns were found through our n-house design team who redesigned a bespoke system, manufacturing an AHU that was considerate of its surroundings and did not cause any noise pollution.  The redesign was approved by the client and architect and installed.
The outcome was successful and both the client and architect were pleased with the reduced noise levels and overall final result.