QUB Physical Education Centre (PEC)

Building Service Upgrade Works at QUB PEC

CHC QUB PEC

 

Client:                         Queen’s University Belfast

Main Contractor:       CHC Group Limited
Completion:               8th October 2012

Details:

CHC operated as main contractor for the installation of new air handling units on the rooftop plant room at QUB Physical Education Centre, as well as modifying the existing duct systems, pipe systems and automatic controls.

All stainless steel ventilation & ductwork was fabricated by our in-house engineering division F3 Engineering.  

The new heating system offered flexibility for the PEC multi-purpose halls whilst also providing optimum energy efficiency within budget.  

CHC also refurbished the shower blocks and toilet areas in the PEC, including all building and electrical works.